This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 2items · current page 1–2 · Source records, not unique facilities.

Power assets and projects · USA · eia860

Wyre Wynd Hydroelectric Project

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)23 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-883bd201f85ee4b0c8eab8d3
Detailed source fields
Original source fieldPublished value or condition
Utility ID66098
Utility NameRelevate Power Management LLC
Plant Code69673
Plant NameWyre Wynd Hydroelectric Project
Street Address81 Anthony Street
CityJewett City
StateCT
Zip6351
CountyNew London
Latitude41.608806
Longitude-71.984983
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Name of Water SourceQuinebaug River
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number99-48-001
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerConnecticut Light & Power Co
Transmission or Distribution System Owner ID4176
Transmission or Distribution System Owner StateCT
Grid Voltage (kV)23
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:16583

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:16583

Sources EV-883bd201f85ee4b0c8eab8d3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 19f5ce6e069a2292a6e81f6abbb8b26ba42b745baf6b069b42bcaa7b9ffff4fc

Usage terms US government public domain

Source snapshots by date · USA · eia860

Wyre Wynd Hydroelectric Project

Power plant · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID66098
Utility NameRelevate Power Management LLC
Plant Code69673
Plant NameWyre Wynd Hydroelectric Project
Street Address81 Anthony Street
CityJewett City
StateCT
Zip6351
CountyNew London
Latitude41.608806
Longitude-71.984983
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Name of Water SourceQuinebaug River
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number99-48-001
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerConnecticut Light & Power Co
Transmission or Distribution System Owner ID4176
Transmission or Distribution System Owner StateCT
Grid Voltage (kV)23
Energy StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:16583

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:16583

Sources EV-883bd201f85ee4b0c8eab8d3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 19f5ce6e069a2292a6e81f6abbb8b26ba42b745baf6b069b42bcaa7b9ffff4fc

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel