Power assets and projects · USA · eia860
Lone Wolfe Phase One
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
24.9 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-0353d5b41380f1df243b3b7f
Detailed source fields
Original source field
Published value or condition
Utility ID
67530
Utility Name
Heritage Energy Holdings, LLC
Plant Code
69580
Plant Name
Lone Wolfe Phase One
Street Address
Block 25 Section 58 A 712 PME
City
Loraine
State
TX
Zip
79532
County
Mitchell
Latitude
32.390278
Longitude
-100.724278
NERC Region
TRE
Balancing Authority Code
ERCO
Balancing Authority Name
Electric Reliability Council of Texas, Inc.
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
23-1275-000
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
Oncor Electric Delivery Company LLC
Transmission or Distribution System Owner ID
44372
Transmission or Distribution System Owner State
TX
Grid Voltage (kV)
24.9
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:16492
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.