Power assets and projects · USA · eia860
Honey Mesquite Wind, LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
345 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-715075f7f73318b458412ca4
Detailed source fields
Original source field
Published value or condition
Utility ID
67192
Utility Name
RWE Clean Energy
Plant Code
69579
Plant Name
Honey Mesquite Wind, LLC
Street Address
893 North McDonald Road
City
Big Spring
State
TX
Zip
79720
County
Sterling
Latitude
32.030383
Longitude
-101.167175
NERC Region
TRE
Balancing Authority Code
ERCO
Balancing Authority Name
Electric Reliability Council of Texas, Inc.
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
11-211-003
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Wind Energy Transmission Texas LLC
Transmission or Distribution System Owner ID
60066
Transmission or Distribution System Owner State
TX
Grid Voltage (kV)
345
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:16491
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.