Power assets and projects · USA · eia860
Hillsboro Solar Project
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
138 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-300d8b54c428091f4a0cb472
Detailed source fields
Original source field
Published value or condition
Utility ID
67313
Utility Name
Ellomay USA Inc
Plant Code
69262
Plant Name
Hillsboro Solar Project
Street Address
7713 State Hwy 171
City
Hillsboro
State
TX
Zip
76645
County
Hill
Latitude
32.029636
Longitude
-97.145546
NERC Region
TRE
Balancing Authority Code
ERCO
Balancing Authority Name
Electric Reliability Council of Texas, Inc.
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Oncor Electric Delivery Company LLC
Transmission or Distribution System Owner ID
44372
Transmission or Distribution System Owner State
TX
Grid Voltage (kV)
138
Energy Storage
N
Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:16177
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.