Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
BWC Origination 19
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
13.8 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-77cfee65328a70a47b2148d0
Detailed source fields
Original source field
Published value or condition
Utility ID
67255
Utility Name
BWC Origination 19 LLC
Plant Code
69125
Plant Name
BWC Origination 19
Street Address
300 South Main St
City
Hopedale
State
MA
Zip
1747
County
Worcester
Latitude
42.111032
Longitude
-71.506145
NERC Region
NPCC
Balancing Authority Code
ISNE
Balancing Authority Name
ISO New England Inc.
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
16-1319-001
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Massachusetts Electric Co
Transmission or Distribution System Owner ID
11804
Transmission or Distribution System Owner State
MA
Grid Voltage (kV)
13.8
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:16044
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.