Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
NJ - CS Energy - Berkeley 1
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
34.5 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-6461df6027b59eb1f8e4768d
Detailed source fields
Original source field
Published value or condition
Utility ID
67238
Utility Name
Eagles Solar I, LLC
Plant Code
69097
Plant Name
NJ - CS Energy - Berkeley 1
Street Address
630 Pinewald Keswich Rd
City
Bayville
State
NJ
Zip
8721
County
Ocean
Latitude
39.9051
Longitude
-74.235121
NERC Region
NPCC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
QF24-412
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Jersey Central Power & Lt Co
Transmission or Distribution System Owner ID
9726
Transmission or Distribution System Owner State
NJ
Grid Voltage (kV)
34.5
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:16016
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.