Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
ME - Novel (Lighthouse Ph I) Mars Hill
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-caa2588dd8207ca7bb58ab45
Detailed source fields
Original source field
Published value or condition
Utility ID
66855
Utility Name
Mars Hill Road Solar Farm, LLC
Plant Code
68484
Plant Name
ME - Novel (Lighthouse Ph I) Mars Hill
Street Address
97 Mars Hill Road
City
Westfield
State
ME
Zip
4787
County
Aroostook
Latitude
46.574069
Longitude
-67.911069
NERC Region
NPCC
Balancing Authority Code
ISNE
Balancing Authority Name
ISO New England Inc.
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
QF20-1126
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Versant Power
Transmission or Distribution System Owner ID
1179
Transmission or Distribution System Owner State
ME
Grid Voltage (kV)
12.47
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:15420
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.