Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
NJ Airport Solar Project B
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
0.48 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-d7f1b363026a8e387d0022d9
Detailed source fields
Original source field
Published value or condition
Utility ID
60520
Utility Name
SoCore Energy LLC
Plant Code
67809
Plant Name
NJ Airport Solar Project B
Street Address
132 Carson Road
City
Newark
State
NJ
Zip
7114
County
Essex
Latitude
40.684
Longitude
-74.191
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
QF21-32
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Public Service Elec & Gas Co
Transmission or Distribution System Owner ID
15477
Transmission or Distribution System Owner State
NJ
Grid Voltage (kV)
0.48
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:14773
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.