Power assets and projects · USA · eia860
ACC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
17 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-d7a6e10b02fa4e887afc808c
Detailed source fields
Original source field
Published value or condition
Utility ID
66109
Utility Name
Entegrity Solar ACC, LLC
Plant Code
67507
Plant Name
ACC
Street Address
220 Sunnyside Drive
City
Searcy
State
AR
Zip
72143
County
Howard
Latitude
33.926859
Longitude
-93.860136
NERC Region
SERC
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Name of Water Source
N/A
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
23-337-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Southwestern Electric Power Co
Transmission or Distribution System Owner ID
17698
Transmission or Distribution System Owner State
AR
Grid Voltage (kV)
17
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:14479
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.