Power assets and projects · USA · eia860
Adams Solar LLC PA
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
115 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-91c0872475e1c5a901265ed5
Detailed source fields
Original source field
Published value or condition
Utility ID
65657
Utility Name
Adams Solar LLC (PA)
Plant Code
66634
Plant Name
Adams Solar LLC PA
Street Address
2165-2233 Old Harrisburg Rd
City
Gettysburg
State
PA
Zip
17325
County
Adams
Latitude
39.879553
Longitude
-77.197226
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
QF23-772
FERC Exempt Wholesale Generator Status
Y
FERC Exempt Wholesale Generator Docket Number
EG23-139
Transmission or Distribution System Owner
Metropolitan Edison Co
Transmission or Distribution System Owner ID
12390
Transmission or Distribution System Owner State
PA
Grid Voltage (kV)
115
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:13649
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.