Power assets and projects · USA · eia860
Foothill Feeder
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
66 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-317c817fadf1eb7c7ae7bad8
Detailed source fields
Original source field
Published value or condition
Utility ID
12397
Utility Name
Metropolitan Water District of S CA
Plant Code
6645
Plant Name
Foothill Feeder
Street Address
81849 N. Lake Hughes Rd.
City
Castaic
State
CA
Zip
91384
County
Los Angeles
Latitude
34.5148
Longitude
-118.6092
NERC Region
WECC
Balancing Authority Code
CISO
Balancing Authority Name
California Independent System Operator
Name of Water Source
Castaic Lake
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Southern California Edison Co
Transmission or Distribution System Owner ID
17609
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
66
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:2257
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.