Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Elizabeth Solar Plant
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
138 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-33cc21fcabc7cace98ef0a11
Detailed source fields
Original source field
Published value or condition
Utility ID
65281
Utility Name
Horus Louisiana 1, LLC
Plant Code
66111
Plant Name
Elizabeth Solar Plant
Street Address
TBD
City
Pitkin
State
LA
Zip
70656
County
Allen
Latitude
30.81981
Longitude
-92.971755
NERC Region
SERC
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Cleco Power LLC
Transmission or Distribution System Owner ID
3265
Transmission or Distribution System Owner State
LA
Grid Voltage (kV)
138
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:13180
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.