Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Gilead Foster City Solar Project
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
0.48 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-12de05945ab5108cd3fd11cb
Detailed source fields
Original source field
Published value or condition
Utility ID
64755
Utility Name
Gilead Sciences Inc. Foster City
Plant Code
65409
Plant Name
Gilead Foster City Solar Project
Street Address
309 Velocity Way
City
Foster City
State
CA
Zip
94404
County
San Mateo
Latitude
37.568597
Longitude
-122.27797
NERC Region
WECC
Balancing Authority Code
CISO
Balancing Authority Name
California Independent System Operator
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Pacific Gas & Electric Co.
Transmission or Distribution System Owner ID
14328
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
0.48
Energy Storage
Y
Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:12548
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.