Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Lahontan
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
60 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-5ec361e456737732a7c73799
Detailed source fields
Original source field
Published value or condition
Utility ID
40444
Utility Name
Truckee-Carson Irrigation District
Plant Code
6521
Plant Name
Lahontan
Street Address
Lahontan Dam
City
Fallon
State
NV
Zip
89406
County
Churchill
Latitude
39.4625
Longitude
-119.0667
NERC Region
WECC
Balancing Authority Code
NEVP
Balancing Authority Name
Nevada Power Company
Name of Water Source
Lahontan Reservoir
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Sierra Pacific Power Co
Transmission or Distribution System Owner ID
17166
Transmission or Distribution System Owner State
NV
Grid Voltage (kV)
60
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:2210
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.