Power assets and projects · USA · eia860
Vallecitos Water District
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-65dd2054ba0a457bf1f78be0
Detailed source fields
Original source field
Published value or condition
Utility ID
65164
Utility Name
CleanCapital Holdings
Plant Code
64438
Plant Name
Vallecitos Water District
Street Address
3566 N Twin Oaks Valley Rd
City
San Marcos
State
CA
Zip
92069
County
San Diego
Latitude
33.212535
Longitude
-117.177029
NERC Region
WECC
Balancing Authority Code
CISO
Balancing Authority Name
California Independent System Operator
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
20-723-000
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
San Diego Gas & Electric Co
Transmission or Distribution System Owner ID
16609
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:11671
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.