Power assets and projects · USA · eia860
Deer Creek (UT)
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
43.8 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-a624b77b90a2d1def5116f4b
Detailed source fields
Original source field
Published value or condition
Utility ID
2518
Utility Name
U S Bureau of Reclamation
Plant Code
6404
Plant Name
Deer Creek (UT)
Street Address
n/a
City
Heber
State
UT
Zip
84601
County
Wasatch
Latitude
40.404354
Longitude
-111.528446
NERC Region
WECC
Balancing Authority Code
WAUW
Balancing Authority Name
Western Area Power Administration UGP West
Name of Water Source
Deer Creek Reservoir
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
WAPA-- Western Area Power Administration
Transmission or Distribution System Owner ID
27000
Transmission or Distribution System Owner State
UT
Grid Voltage (kV)
43.8
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:2152
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.