Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Blooming Grove Wind Energy Center
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
345 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-1f2884060dc0cce1a4c4613a
Detailed source fields
Original source field
Published value or condition
Utility ID
49893
Utility Name
Invenergy Services LLC
Plant Code
63988
Plant Name
Blooming Grove Wind Energy Center
Street Address
26579 N 2750 East Rd
City
Chenoa
State
IL
Zip
61726
County
Livingston
Latitude
40.661079
Longitude
-88.395079
NERC Region
SERC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Commonwealth Edison Co
Transmission or Distribution System Owner ID
4110
Transmission or Distribution System Owner State
IL
Grid Voltage (kV)
345
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:11247
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.