Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
PG Solar, LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-89e91104875852343222f443
Detailed source fields
Original source field
Published value or condition
Utility ID
13683
Utility Name
North Carolina El Member Corp
Plant Code
63692
Plant Name
PG Solar, LLC
Street Address
Near 170 NC Highway 403 West
City
Mt Olive
State
NC
Zip
28572
County
Duplin
Latitude
35.167164
Longitude
-78.017811
NERC Region
SERC
Balancing Authority Code
CPLE
Balancing Authority Name
Duke Energy Progress East
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
18-931-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Tri-County Elec Member Corp
Transmission or Distribution System Owner ID
18956
Transmission or Distribution System Owner State
GA
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:10972
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.