Laurel Village (CSG)
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-26f1fca830dc0ffc4670cd39
Detailed source fields
Original source field
Published value or condition
Utility ID
65164
Utility Name
CleanCapital Holdings
Plant Code
63679
Plant Name
Laurel Village (CSG)
Street Address
4500 Omer Ave SW
City
Cokato
State
MN
Zip
55321
County
Wright
Latitude
45.083808
Longitude
-94.179684
NERC Region
MRO
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
20-833-000
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
Northern States Power Co - Minnesota
Transmission or Distribution System Owner ID
13781
Transmission or Distribution System Owner State
MN
Grid Voltage (kV)
12.47
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:10959
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.