Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Sierra Pacific Industries (2042-RD)
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-5ee51e2eece5ac6a70d1ae69
Detailed source fields
Original source field
Published value or condition
Utility ID
17164
Utility Name
Sierra Pacific Industries
Plant Code
63416
Plant Name
Sierra Pacific Industries (2042-RD)
Street Address
11400 Reading Rd.
City
Red Bluff
State
CA
Zip
96080
County
Tehama
Latitude
40.121389
Longitude
-122.191944
NERC Region
WECC
Balancing Authority Code
CISO
Balancing Authority Name
California Independent System Operator
Primary Purpose (NAICS Code)
321
Regulatory Status
NR
Sector
6
Sector Name
Industrial Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
QF20-587-000
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
Pacific Gas & Electric Co.
Transmission or Distribution System Owner ID
14328
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
12
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:10713
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.