Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Galesburg Solar Array
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-e4f22171c4dcec7152169de5
Detailed source fields
Original source field
Published value or condition
Utility ID
60571
Utility Name
Onsite Partners, LLC
Plant Code
63399
Plant Name
Galesburg Solar Array
Street Address
1965 State Hwy 164
City
Oquawka
State
IL
Zip
61469
County
Henderson
Latitude
40.9199
Longitude
-90.9484
NERC Region
SERC
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
20-317-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Ameren Illinois Company
Transmission or Distribution System Owner ID
56697
Transmission or Distribution System Owner State
IL
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:10697
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.