Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Beverly L&D Hydroelectric Project
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
69 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-62b00daef190f688b9707859
Detailed source fields
Original source field
Published value or condition
Utility ID
61906
Utility Name
Rye Development
Plant Code
62403
Plant Name
Beverly L&D Hydroelectric Project
Street Address
TBD
City
Waterford Township
State
OH
Zip
45786
County
Washington
Latitude
39.555073
Longitude
-81.646517
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Name of Water Source
Muskingum River
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Grid Voltage (kV)
69
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:9807
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.