This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 2items · current page 1–2 · Source records, not unique facilities.

Power assets and projects · USA · eia860

Antelope Expansion 1B

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)220 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-b9127443344bc695cbc4a1a3
Detailed source fields
Original source fieldPublished value or condition
Utility ID61012
Utility NameAES Distributed Energy
Plant Code62320
Plant NameAntelope Expansion 1B
Street AddressTBD
CityLancaster
StateCA
Zip93535
CountyLos Angeles
Latitude34.71611
Longitude-118.259161
NERC RegionWECC
Balancing Authority CodeCISO
Balancing Authority NameCalifornia Independent System Operator
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerSouthern California Edison Co
Transmission or Distribution System Owner ID17609
Transmission or Distribution System Owner StateCA
Grid Voltage (kV)220
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:9736

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:9736

Sources EV-b9127443344bc695cbc4a1a3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e7239c0d9ab120d336a51f34325b192cb5dbae5d7decd1b7a1c93207b7fdf25b

Usage terms US government public domain

Source snapshots by date · USA · eia860

Antelope Expansion 1B

Power plant · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID61012
Utility NameAES Distributed Energy
Plant Code62320
Plant NameAntelope Expansion 1B
Street AddressTBD
CityLancaster
StateCA
Zip93535
CountyLos Angeles
Latitude34.71611
Longitude-118.259161
NERC RegionWECC
Balancing Authority CodeCISO
Balancing Authority NameCalifornia Independent System Operator
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Transmission or Distribution System OwnerSouthern California Edison Co
Transmission or Distribution System Owner ID17609
Transmission or Distribution System Owner StateCA
Grid Voltage (kV)220
Energy StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:9736

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:9736

Sources EV-b9127443344bc695cbc4a1a3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e7239c0d9ab120d336a51f34325b192cb5dbae5d7decd1b7a1c93207b7fdf25b

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel