Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Warren Solar Farm LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
22.86 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-a85f442efe4f602213d37674
Detailed source fields
Original source field
Published value or condition
Utility ID
61677
Utility Name
Sol Systems
Plant Code
62223
Plant Name
Warren Solar Farm LLC
Street Address
248 West Grove Street
City
Newton Grove
State
NC
Zip
28366
County
Sampson
Latitude
35.252
Longitude
-78.369
NERC Region
SERC
Balancing Authority Code
CPLE
Balancing Authority Name
Duke Energy Progress East
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
16-1063-001
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
Duke Energy Progress - (NC)
Transmission or Distribution System Owner ID
3046
Transmission or Distribution System Owner State
NC
Grid Voltage (kV)
22.86
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:9666
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.