Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Cascade Solar (TX)
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-dea8ca5f2d17f30e9aa818e8
Detailed source fields
Original source field
Published value or condition
Utility ID
61060
Utility Name
Cypress Creek Renewables
Plant Code
61875
Plant Name
Cascade Solar (TX)
Street Address
10407 TX-60
City
Wharton
State
TX
Zip
77488
County
Wharton
Latitude
29.205355
Longitude
-96.023384
NERC Region
TRE
Balancing Authority Code
ERCO
Balancing Authority Name
Electric Reliability Council of Texas, Inc.
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
CenterPoint Energy
Transmission or Distribution System Owner ID
8901
Transmission or Distribution System Owner State
TX
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:9354
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.