Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
CED Foster
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
15 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-9b381ec60975a1c487a5a67c
Detailed source fields
Original source field
Published value or condition
Utility ID
67192
Utility Name
RWE Clean Energy
Plant Code
61499
Plant Name
CED Foster
Street Address
188 1/2 Danielson Pike
City
Foster
State
RI
Zip
2825
County
Providence
Latitude
41.795
Longitude
-71.787
NERC Region
NPCC
Balancing Authority Code
ISNE
Balancing Authority Name
ISO New England Inc.
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
17-287-003
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
Municipal Electric Authority
Transmission or Distribution System Owner ID
13100
Grid Voltage (kV)
15
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:8999
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.