POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 2items · current page 1–2 · Source records, not unique facilities.

Power assets and projects · USA · eia860

Intel Folsom Phase 3

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)1 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-be9dac668a6171ca7668c905
Detailed source fields
Original source fieldPublished value or condition
Utility ID57313
Utility NameTesla Inc.
Plant Code61152
Plant NameIntel Folsom Phase 3
Street Address1900 Prairie City Road
CityFolsom
StateCA
Zip95630
CountySacramento
Latitude38.645961
Longitude-121.162623
NERC RegionWECC
Balancing Authority CodeBANC
Balancing Authority NameBalancing Authority of Northern California
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Transmission or Distribution System OwnerSacramento Municipal Util Dist
Transmission or Distribution System Owner ID16534
Transmission or Distribution System Owner StateCA
Grid Voltage (kV)1
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:8704

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:8704

Sources EV-be9dac668a6171ca7668c905
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 30fc5d5e68cfb9510552e4900c93bbd7ff40f3b4d1739dd9bbf5c55e0d7a867f

Usage terms US government public domain

Source snapshots by date · USA · eia860

Intel Folsom Phase 3

Power plant · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID57313
Utility NameTesla Inc.
Plant Code61152
Plant NameIntel Folsom Phase 3
Street Address1900 Prairie City Road
CityFolsom
StateCA
Zip95630
CountySacramento
Latitude38.645961
Longitude-121.162623
NERC RegionWECC
Balancing Authority CodeBANC
Balancing Authority NameBalancing Authority of Northern California
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Transmission or Distribution System OwnerSacramento Municipal Util Dist
Transmission or Distribution System Owner ID16534
Transmission or Distribution System Owner StateCA
Grid Voltage (kV)1
Energy StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:8704

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:8704

Sources EV-be9dac668a6171ca7668c905
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 30fc5d5e68cfb9510552e4900c93bbd7ff40f3b4d1739dd9bbf5c55e0d7a867f

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel