Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Boardman
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
500 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-c3afedcaedebe9f86ec8210c
Detailed source fields
Original source field
Published value or condition
Utility ID
15248
Utility Name
Portland General Electric Co
Plant Code
6106
Plant Name
Boardman
Street Address
73334 Tower Rd
City
Boardman
State
OR
Zip
97818
County
Morrow
Latitude
45.693182
Longitude
-119.808819
NERC Region
WECC
Balancing Authority Code
PGE
Balancing Authority Name
Portland General Electric Company
Name of Water Source
Carty Reservoir
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Bonneville Power Administration
Transmission or Distribution System Owner ID
1738
Transmission or Distribution System Owner State
OR
Grid Voltage (kV)
500
Energy Storage
N
Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:2016
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.