POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 2items · current page 1–2 · Source records, not unique facilities.

Power assets and projects · USA · eia860

Green River Wind Farm

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)138 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-cfb3d1084b9a2d5c3a3d5be2
Detailed source fields
Original source fieldPublished value or condition
Utility ID62759
Utility NameGeronimo Power
Plant Code60471
Plant NameGreen River Wind Farm
Street Address2723 County Line Rd
CityDeer Grove
StateIL
Zip61243
CountyLee
Latitude41.620264
Longitude-89.557033
NERC RegionRFC
Balancing Authority CodePJM
Balancing Authority NamePJM Interconnection, LLC
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusY
FERC Exempt Wholesale Generator Docket Number18-122-000
Transmission or Distribution System OwnerCommonwealth Edison Co
Transmission or Distribution System Owner ID4110
Transmission or Distribution System Owner StateIL
Grid Voltage (kV)138
Energy StorageN
Natural Gas StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:8118

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:8118

Sources EV-cfb3d1084b9a2d5c3a3d5be2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d87654857e1c46e325bb24312b746a6b410563f8a65bcad0911114c1df5fcdfd

Usage terms US government public domain

Source snapshots by date · USA · eia860

Green River Wind Farm

Power plant · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID62759
Utility NameGeronimo Power
Plant Code60471
Plant NameGreen River Wind Farm
Street Address2723 County Line Rd
CityDeer Grove
StateIL
Zip61243
CountyLee
Latitude41.620264
Longitude-89.557033
NERC RegionRFC
Balancing Authority CodePJM
Balancing Authority NamePJM Interconnection, LLC
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusY
FERC Exempt Wholesale Generator Docket Number18-122-000
Transmission or Distribution System OwnerCommonwealth Edison Co
Transmission or Distribution System Owner ID4110
Transmission or Distribution System Owner StateIL
Grid Voltage (kV)138
Energy StorageN
Natural Gas StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:8118

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:8118

Sources EV-cfb3d1084b9a2d5c3a3d5be2
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d87654857e1c46e325bb24312b746a6b410563f8a65bcad0911114c1df5fcdfd

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel