Power assets and projects · USA · eia860
Red Rock
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
115 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-752ea0b8cb5eba7e0e426702
Detailed source fields
Original source field
Published value or condition
Utility ID
803
Utility Name
Arizona Public Service Co
Plant Code
60467
Plant Name
Red Rock
Street Address
25990 East Camino Adelante Roa
City
Red Rock
State
AZ
Zip
85145
County
Maricopa
Latitude
32.551026
Longitude
-111.289232
NERC Region
WECC
Balancing Authority Code
AZPS
Balancing Authority Name
Arizona Public Service Company
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Arizona Public Service Co
Transmission or Distribution System Owner ID
803
Transmission or Distribution System Owner State
AZ
Grid Voltage (kV)
115
Energy Storage
Y
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:8114
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.