Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Flint Hill Solar, LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-a23ab59d168a1f9040df6edc
Detailed source fields
Original source field
Published value or condition
Utility ID
61060
Utility Name
Cypress Creek Renewables
Plant Code
60370
Plant Name
Flint Hill Solar, LLC
Street Address
12326 NC 24-27 HWY
City
Carthage
State
NC
Zip
28327
County
Moore
Latitude
35.40274
Longitude
-79.55308
NERC Region
SERC
Balancing Authority Code
CPLE
Balancing Authority Name
Duke Energy Progress East
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
SP-4442
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Randolph Electric Member Corp
Transmission or Distribution System Owner ID
15671
Transmission or Distribution System Owner State
NC
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:8024
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.