Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Hyline Solar Center, LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-13259e0e0800bcb2b5b3c781
Detailed source fields
Original source field
Published value or condition
Utility ID
61060
Utility Name
Cypress Creek Renewables
Plant Code
60331
Plant Name
Hyline Solar Center, LLC
Street Address
4910 Power Road
City
Ontario
State
OR
Zip
97914
County
Malheur
Latitude
44.151256
Longitude
-117.000071
NERC Region
WECC
Balancing Authority Code
IPCO
Balancing Authority Name
Idaho Power Company
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
14-70-001
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Idaho Power Co
Transmission or Distribution System Owner ID
9191
Transmission or Distribution System Owner State
OR
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:7986
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.