Power assets and projects · USA · eia860
Grove Solar
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
22.86 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-2a28c60ff855b03a6571af6b
Detailed source fields
Original source field
Published value or condition
Utility ID
61677
Utility Name
Sol Systems
Plant Code
60181
Plant Name
Grove Solar
Street Address
1100 Washington Post Road
City
New Bern
State
NC
Zip
28560
County
Craven
Latitude
35.16922
Longitude
-77.1182
NERC Region
SERC
Balancing Authority Code
DUK
Balancing Authority Name
Duke Energy Carolinas
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
QF15-344-000
FERC Exempt Wholesale Generator Status
N
Transmission or Distribution System Owner
Duke Energy Progress - (NC)
Transmission or Distribution System Owner ID
3046
Transmission or Distribution System Owner State
NC
Grid Voltage (kV)
22.86
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:7856
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.