Power assets and projects · USA · eia860
East Bend
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
345 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-4f9f8d3cad2161b2b3763307
Detailed source fields
Original source field
Published value or condition
Utility ID
55729
Utility Name
Duke Energy Kentucky Inc
Plant Code
6018
Plant Name
East Bend
Street Address
6293 Beaver Rd
City
Union
State
KY
Zip
41091
County
Boone
Latitude
38.9036
Longitude
-84.8514
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Name of Water Source
Ohio River
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
Y
Ash Impoundment Lined?
N
Ash Impoundment Status
OP
Transmission or Distribution System Owner
Duke Energy Ohio Inc
Transmission or Distribution System Owner ID
3542
Transmission or Distribution System Owner State
OH
Grid Voltage (kV)
345
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:1962
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.