Power assets and projects · USA · eia860
Perry Solar Facility
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-23a2084c4fa16bbb24123eb6
Detailed source fields
Original source field
Published value or condition
Utility ID
6455
Utility Name
Duke Energy Florida, LLC
Plant Code
60071
Plant Name
Perry Solar Facility
Street Address
1690 Green Street East
City
Perry
State
FL
Zip
32347
County
Taylor
Latitude
30.119304
Longitude
-83.560054
NERC Region
SERC
Balancing Authority Code
FPC
Balancing Authority Name
Progress Energy Florida
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Duke Energy Florida, Inc
Transmission or Distribution System Owner ID
6455
Transmission or Distribution System Owner State
FL
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:7773
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.