Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Kings Park Solar II
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
13.2 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-e8841c5cf7eb1dd1a5c38eb9
Detailed source fields
Original source field
Published value or condition
Utility ID
65043
Utility Name
Madison Energy Investments LLC
Plant Code
59881
Plant Name
Kings Park Solar II
Street Address
400 Old Northport Road
City
Kings Park
State
NY
Zip
11754
County
Suffolk
Latitude
40.868294
Longitude
-73.249281
NERC Region
NPCC
Balancing Authority Code
NYIS
Balancing Authority Name
New York Independent System Operator
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Long Island Power Authority
Transmission or Distribution System Owner ID
11171
Transmission or Distribution System Owner State
NY
Grid Voltage (kV)
13.2
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:7611
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.