Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Southeast Berrien Generating Facility
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
69 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-71e72d2294d3e91565b3fb1b
Detailed source fields
Original source field
Published value or condition
Utility ID
13559
Utility Name
North American Natural Res
Plant Code
59574
Plant Name
Southeast Berrien Generating Facility
Street Address
1520 Mayflower Road
City
Niles
State
MI
Zip
49120
County
Berrien
Latitude
41.808611
Longitude
-86.323889
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Indiana Michigan Power Co
Transmission or Distribution System Owner ID
9324
Transmission or Distribution System Owner State
MI
Grid Voltage (kV)
69
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:7343
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.