Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Prospector Windfarm (Burnt River)
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
138 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-8a2b7aebcbe6c8a9f5fb25a0
Detailed source fields
Original source field
Published value or condition
Utility ID
59863
Utility Name
Prospector
Plant Code
59493
Plant Name
Prospector Windfarm (Burnt River)
Street Address
5980 Hwy 30
City
Huntington
State
OR
Zip
97907
County
Baker
Latitude
44.418056
Longitude
-117.255
NERC Region
WECC
Balancing Authority Code
IPCO
Balancing Authority Name
Idaho Power Company
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
12-180-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Idaho Power Co
Transmission or Distribution System Owner ID
9191
Transmission or Distribution System Owner State
OR
Grid Voltage (kV)
138
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:7266
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.