Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Alamo Solar
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
33 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-edf937a51fa68296bf349282
Detailed source fields
Original source field
Published value or condition
Utility ID
60453
Utility Name
Onward Energy
Plant Code
59469
Plant Name
Alamo Solar
Street Address
14523 Melrose Road
City
Oro Grande
State
CA
Zip
92368
County
San Bernardino
Latitude
34.682222
Longitude
-117.3475
NERC Region
WECC
Balancing Authority Code
CISO
Balancing Authority Name
California Independent System Operator
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
15-601-003
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Southern California Edison Co
Transmission or Distribution System Owner ID
17609
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
33
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:7243
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.