Power assets and projects · USA · eia860
Bison 4 Wind Energy Center
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
230 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-efa33aee7b365f85b8c0bc05
Detailed source fields
Original source field
Published value or condition
Utility ID
12647
Utility Name
ALLETE, Inc.
Plant Code
58872
Plant Name
Bison 4 Wind Energy Center
Street Address
5198 30th St.
City
New Salem
State
ND
Zip
58563
County
Morton
Latitude
46.98
Longitude
-101.554722
NERC Region
MRO
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
ALLETE, Inc.
Transmission or Distribution System Owner ID
12647
Transmission or Distribution System Owner State
MN
Grid Voltage (kV)
230
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:6760
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.