Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Gratiot County Wind LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
138 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-99970cba0234c2d364167a9a
Detailed source fields
Original source field
Published value or condition
Utility ID
49893
Utility Name
Invenergy Services LLC
Plant Code
58677
Plant Name
Gratiot County Wind LLC
Street Address
126 Enterprise Drive
City
Breckenridge
State
MI
Zip
48615
County
Gratiot
Latitude
43.408056
Longitude
-84.462222
NERC Region
RFC
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Michigan Electric Transmission Company
Transmission or Distribution System Owner ID
56163
Transmission or Distribution System Owner State
MI
Grid Voltage (kV)
138
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:6602
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.