Power assets and projects · USA · eia860

Bellingham PV

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)13.2 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-904e1a11d7b023f9f2f0fd39
Detailed source fields
Original source fieldPublished value or condition
Utility ID63249
Utility NameTerraform Arcadia
Plant Code58403
Plant NameBellingham PV
Street Address436 NE Main Street
CityDouglas
StateMA
Zip1516
CountyWorcester
Latitude42.075
Longitude-71.703056
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerMassachusetts Electric Co
Transmission or Distribution System Owner ID11804
Transmission or Distribution System Owner StateMA
Grid Voltage (kV)13.2
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:6353

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:6353

Sources EV-904e1a11d7b023f9f2f0fd39
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 79128cddf0dfedf353803f3066a2f8a46f203c23c16d0fce6a047341e04134fe

Usage terms US government public domain

Source snapshots by date · USA · eia860

Bellingham PV

Power plant · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID63249
Utility NameTerraform Arcadia
Plant Code58403
Plant NameBellingham PV
Street Address436 NE Main Street
CityDouglas
StateMA
Zip1516
CountyWorcester
Latitude42.075
Longitude-71.703056
NERC RegionNPCC
Balancing Authority CodeISNE
Balancing Authority NameISO New England Inc.
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerMassachusetts Electric Co
Transmission or Distribution System Owner ID11804
Transmission or Distribution System Owner StateMA
Grid Voltage (kV)13.2
Energy StorageN
source_record_id2___Plant_Y2025.xlsx#Plant:6353

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:6353

Sources EV-904e1a11d7b023f9f2f0fd39
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 79128cddf0dfedf353803f3066a2f8a46f203c23c16d0fce6a047341e04134fe

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel