Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Buzzard Roost GT
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
100 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-cc8dd4d0ea34432f39b27c16
Detailed source fields
Original source field
Published value or condition
Utility ID
5416
Utility Name
Duke Energy Carolinas, LLC
Plant Code
58212
Plant Name
Buzzard Roost GT
Street Address
35797 SC Hwy 34
City
Chappells
State
SC
Zip
29037
County
Greenwood
Latitude
34.171389
Longitude
-81.911667
NERC Region
SERC
Balancing Authority Code
DUK
Balancing Authority Name
Duke Energy Carolinas
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Duke Energy Carolinas, LLC
Transmission or Distribution System Owner ID
5416
Transmission or Distribution System Owner State
NC
Grid Voltage (kV)
100
Energy Storage
N
Natural Gas Pipeline Name 1
CAROLINA GAS TRANSMISSION CORP
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:6184
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.