Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
IKEA College Park 411
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
0.48 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-a0adad68a0a30b6ac309e423
Detailed source fields
Original source field
Published value or condition
Utility ID
57389
Utility Name
IKEA Property Inc
Plant Code
58015
Plant Name
IKEA College Park 411
Street Address
10100 Baltimore Ave.
City
College Park
State
MD
Zip
20740
County
Prince Georges
Latitude
39.021
Longitude
-76.926
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Primary Purpose (NAICS Code)
53
Regulatory Status
NR
Sector
4
Sector Name
Commercial Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Potomac Electric Power Co
Transmission or Distribution System Owner ID
15270
Transmission or Distribution System Owner State
MD
Grid Voltage (kV)
0.48
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:6015
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.