Power assets and projects · USA · eia860
Lebanon Pines 1 & 2
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
13.8 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-9e14869ceb47386b901baff5
Detailed source fields
Original source field
Published value or condition
Utility ID
4180
Utility Name
Connecticut Mun Elec Engy Coop
Plant Code
57604
Plant Name
Lebanon Pines 1 & 2
Street Address
37 Camp Moween Rd
City
Lebanon
State
CT
Zip
6249
County
New London
Latitude
41.5683
Longitude
-72.2322
NERC Region
NPCC
Balancing Authority Code
ISNE
Balancing Authority Name
ISO New England Inc.
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Bozrah Light & Power Company
Transmission or Distribution System Owner ID
2089
Transmission or Distribution System Owner State
CT
Grid Voltage (kV)
13.8
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:5677
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.