Power assets and projects · USA · eia860
Adelanto Solar Project
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
4.16 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-f37c6cc4207e36409418db77
Detailed source fields
Original source field
Published value or condition
Utility ID
11208
Utility Name
Los Angeles Department of Water & Power
Plant Code
57305
Plant Name
Adelanto Solar Project
Street Address
16800 Aster Road
City
Adelanto
State
CA
Zip
92301
County
San Bernardino
Latitude
34.550833
Longitude
-117.435277
NERC Region
WECC
Balancing Authority Code
LDWP
Balancing Authority Name
Los Angeles Department of Water and Power
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Intermountain Power Agency
Transmission or Distribution System Owner ID
40576
Grid Voltage (kV)
4.16
Energy Storage
N
Natural Gas Storage
X
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:5435
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.