Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
G2 Energy Marion LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
12.47 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-06b07dd19e153081f42e3581
Detailed source fields
Original source field
Published value or condition
Utility ID
56440
Utility Name
G2 Energy LLC
Plant Code
57128
Plant Name
G2 Energy Marion LLC
Street Address
5601 SE 66th Street
City
Ocala
State
FL
Zip
34480
County
Marion
Latitude
29.122882
Longitude
-82.055452
NERC Region
SERC
Balancing Authority Code
FPC
Balancing Authority Name
Progress Energy Florida
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
09-10-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Duke Energy Florida, Inc
Transmission or Distribution System Owner ID
6455
Transmission or Distribution System Owner State
FL
Grid Voltage (kV)
12.47
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:5292
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.