Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Taylor
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
25 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-ca4fc2c81a8007a87f6113bf
Detailed source fields
Original source field
Published value or condition
Utility ID
55858
Utility Name
Energy Developments, Inc d/b/a EDL
Plant Code
56870
Plant Name
Taylor
Street Address
County Road 33 & Stewart Road
City
Mauk
State
GA
Zip
31058
County
Taylor
Latitude
32.4522
Longitude
-84.3872
NERC Region
SERC
Balancing Authority Code
SOCO
Balancing Authority Name
Southern Company Services, Inc. - Trans
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
Y
FERC Exempt Wholesale Generator Docket Number
03-149-000
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Flint Electric Membership Corp
Transmission or Distribution System Owner ID
6411
Transmission or Distribution System Owner State
GA
Grid Voltage (kV)
25
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:5071
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.