Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Covel Gardens Gas Recovery
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
13.2 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-6a74f4edf35b0fb6b7363869
Detailed source fields
Original source field
Published value or condition
Utility ID
55858
Utility Name
Energy Developments, Inc d/b/a EDL
Plant Code
56864
Plant Name
Covel Gardens Gas Recovery
Street Address
8611 Covel Road
City
San Antonio
State
TX
Zip
78252
County
Bexar
Latitude
29.3467
Longitude
-98.6536
NERC Region
TRE
Balancing Authority Code
ERCO
Balancing Authority Name
Electric Reliability Council of Texas, Inc.
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
Y
FERC Exempt Wholesale Generator Docket Number
08-648-000
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
City of San Antonio - (TX)
Transmission or Distribution System Owner ID
16604
Transmission or Distribution System Owner State
TX
Grid Voltage (kV)
13.2
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:5065
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.