Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Elm Creek Wind LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
34.5 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-ef51a0ab4aec8fa9ce86404e
Detailed source fields
Original source field
Published value or condition
Utility ID
15399
Utility Name
Avangrid Power LLC
Plant Code
56793
Plant Name
Elm Creek Wind LLC
Street Address
231 220th Street
City
Trimont
State
MN
Zip
56176
County
Jackson
Latitude
43.7542
Longitude
-94.9497
NERC Region
MRO
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
Y
FERC Exempt Wholesale Generator Docket Number
EG09-7-000
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
PPL Electric Utilities Corp
Transmission or Distribution System Owner ID
14715
Transmission or Distribution System Owner State
PA
Grid Voltage (kV)
34.5
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:5004
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.